Bina Thermal Power plant – 500 MW

Project Profile JPVL has acquired Bina Power Supply Company Limited (BPSCL) from Aditya Birla Group. BPSCL was set up by the Aditya Birla Group to set up a coal fired Thermal Power Plant at Bina in the state of Madhya Pradesh. The project was commissioned in April 2013. Regulatory Information
Title Month
Bina Coal Details Aug 2024
Bina Coal Details Jul 2024
Bina Coal Details Jun 2024
Environment
Title Date
Environment Compliance Report Oct 2022 To Mar 2023
Environment Statement JBTPP 2021-2022
Environment Compliance Report Apr 2022 To Sep 2022
Environment Compliance Report Oct 2021 To Mar 2022
Environment Compliance Report Apr 2021 To Sep 2021
Environment Compliance Report Oct 2017 To Mar 2018
Environment Compliance Report Mar 2017 To May 2017
Environment Compliance Report Dec 2016 To Feb 2017
Environment Compliance Report Oct 2014 To Mar 2015
Environment Compliance Status Apr 2014 To Sept 2014
Environment Clearance Compliance Report Oct 2013 To Mar 2014
Bills of landed price of coal for JBTPP
Month Week
Aug 2024 Week 1
Week 2
Week 3
Week 4
Jul 2024 Week 1
Week 2
Week 3
Week 4
Jun 2024 Week 1
Week 2
Week 3
Week 4

Nigrie Thermal Power Plant – 2X660 MW

Project Profile Jaypee Nigrie Super Thermal Power Project comprising 2 x 660 MW Super-critical Unit has been set up by JPVL at a site in Nigrie – Village, Tehsil – Deosar, District – Singrauli in Madhya Pradesh. The project was commissioned in February 2015. The Nigrie Thermal Project is utilizing coal from Amelia (North) Coal Block with the reserve of 123 MT. Features:
  • Super critical boiler technology will achieve an unprecedented net efficiency level for brown coal power stations. This technology’s higher steam temperatures and pressure parameters offer the most economical way to improve plant efficiency and operating flexibility – as well as achieve fuel cost savings and lower emissions for each KWH of electricity
  • Improved thermal efficiency
  • Lower emissions levels
  • Lower operating costs
  • Greater operating flexibility
  • Reduced fuel consumption
  • Reduced fuel cost
  • Reduced ash generation
  • Reduction of carbon dioxide emission due to less consumption of fuel
  • Very good part load efficiency as compared to sub-critical unit
  • Reduced NOx, Sox and SPM emission
Technical Information
      • 1320 MW super critical technology boiler, pit head based Thermal Power Plant
      • 400 KV DC Power Transmission Line will be commissioned by June 2013
      • Railway Sidings viz. Nigrie-Niwas Road Railway station and Amelia (North) – Majhauli Railway Station will be commissioned by July 2013
Regulatory Information
Title Month
Nigrie Billing Coal Details Aug 2024
Nigrie Billing Coal Details Jul 2024
Nigrie Billing Coal Details Jun 2024
Environment
Title Date
Ash Availability Details of JNSTPP Sep – 2024
JNSTPP, Nigrie Environment Statement FY 2023-24
JNCGU, Nigrie Environment Statement FY 2023-24
Ash Availability Details of JNSTPP Aug – 2024
Ash Availability Details of JNSTPP Jul – 2024
Quaterly Monitoring Report JNSTPP Apr 2024 – Jun 2024
Quaterly Monitoring Report JNCGU Apr 2024 – Jun 2024
Ash Availability Details of JNSTPP Jun – 2024
Ash Availability Details of JNSTPP May – 2024
Ash Availability Details of JNSTPP Apr – 2024
Half yearly EC Compliance JNSTPP, Nigrie Oct 2023 – Mar 2024
Quaterly Monitoring Report JNSTPP Jan 2024 – Mar 2024
Quaterly Monitoring Report JNCGU Jan 2024 – Mar 2024
Ash Availability Details of JNSTPP Mar – 2024
Ash Availability Details of JNSTPP Feb – 2024
Ash Availability Details of JNSTPP Jan – 2024
Quaterly Monitoring Report JNSTPP Oct 2023 – Dec 2023
Quaterly Monitoring Report JNCGU Oct 2023 – Dec 2023
Half yearly EC Compliance JNSTPP, Nigrie Apr 2023 – Sep 2023
Quaterly monitoring report JNSTPP Jul 2023 – Sep 2023
Quaterly monitoring report JNCGU Jul 2023 – Sep 2023
Quaterly monitoring report JNSTPP Apr 2023 – Jun 2023
Quaterly monitoring report JNCGU Apr 2023 – Jun 2023
Half yearly EC Compliance JNSTPP, Nigrie Oct 2022 – Mar 2023
Quaterly monitoring report JNSTPP Jan 2023 – Mar 2023
Quaterly monitoring report JNCGU Jan 2023 – Mar 2023
Quaterly monitoring report JNSTPP Oct 2022 – Dec 2022
Quaterly monitoring report JNCGU Oct 2022 – Dec 2022
Half yearly EC Compliance JNSTPP, Nigrie Apr 2022 – Sep 2022
Ash Availability Details of JNSTPP Nov- 2023
Ash Availability Details of JNSTPP Oct- 2023
Ash Availability Details of JNSTPP Sep- 2023
Ash Availability Details of JNSTPP Aug- 2023
Ash Availability Details of JNSTPP Jul- 2023
Ash Availability Details of JNSTPP Jun- 2023
Ash Availability Details of JNSTPP May- 2023
Ash Availability Details of JNSTPP Apr- 2023
Ash Availability Details of JNSTPP Mar – 2023
Ash Availability Details of JNSTPP Feb – 2023
Ash Availability Details of JNSTPP Jan – 2023
Ash Availability Details of JNSTPP Dec – 2022
Ash Availability Details of JNSTPP Nov – 2022
Ash Availability Details of JNSTPP Oct – 2022
Ash Availability Details of JNSTPP Sep – 2022
Quaterly monitoring report JNSTPP Jul 2022 – Sep 2022
Quaterly monitoring report JNCGU Jul 2022 – Sep 2022
Ash Availability Details of JNSTPP Aug- 2022
Ash Availability Details of JNSTPP July- 2022
Quarterly Report-JNSTPP Apr 2022 – Jun 2022
Quarterly Report-JNCGU Apr 2022 – Jun 2022
Ash Availability Details of JNSTPP Jun- 2022
Ash Availability Details of JNSTPP May- 2022
Half yearly EC Compliance JNSTPP, Nigrie Oct 2021 – Mar 2022
JNSTPP, Nigrie Environment Statement 2022-23
JNCGU, Nigrie Environment Statement 2022-23
JNSTPP, Nigrie Environment Statement 2021-22
JNCGU, Nigrie Environment Statement 2021-22
Ash Availability Details of JNSTPP April- 2022
Quarterly Report-JNSTPP Jan 2022 – March 2022
Quarterly Report-JNCGU Jan 2022 – March 2022
Ash Availability Details of JNSTPP March – 2022
Details of Ash Generation, Utilization up to the Month of February – 2022 February – 2022
Details of Ash Generation, Utilization up to the Month of January – 2022 January – 2022
Quaterly monitoring report JNSTPP Oct 2021 – Dec 2021
Quaterly monitoring report JNCGU Oct, 2021 – Dec, 2021
Details of Ash Generation, Utilization up to the Month of December – 2021 December – 2021
Details of Ash Generation, Utilization up to the Month of November – 2021 November – 2021
Details of Ash Generation, Utilization up to the Month of October – 2021 October – 2021
Half yearly EC Compliance JNSTPP April 2021 – Sept 2021
Quaterly monitoring report JNCGU July, 2021 – Sept, 2021
Quaterly monitoring report JNSTPP July, 2021 – Sept, 2021
Details of Ash Generation, Utilization up to the Month of Sep- 2021 Sept 2021
Details of Ash Generation, Utilization up to the Month of Aug – 2021 Aug 2021
Details of Ash Generation, Utilization up to the Month of July – 2021 Jul 2021
Quaterly report (JNSTPP, Nigrie) April-June,2021
Quaterly Report ((JNCGU, Nigrie) April-June,2021
Details of Ash Generation, Utilization up to the Month of June – 2021 June – 2021
Environment Statement Report of JNCGU (Jaypee Cement Grinding Unit) 2020 – 2021
Environment Statement Report (JNSTPP) 2020 – 2021
22nd EC Compliance Report Oct 2020 – Mar 2021
22nd EC Compliance Report Oct 2020 – Mar 2021
Details of Ash Generation, Utilization up to the Month of May – 2021 May – 2021
Details of Ash Generation, Utilization up to the Month of March – 2021 March – 2021
JNSTPP Jan, Feb, March 2021 Jan’21 – Mar’21
JNCGU Jan, Feb, March 2021 Jan’21 – Mar’21
Details of Ash Generation, Utilization up to the Month of February – 2021 February – 2021
Details of Ash Generation, Utilization up to the Month of January – 2021 January – 2021
Ash Availability Details of JNSTPP December – 2020
JNSTPP Oct, Nov, Dec 2020 Oct 20 – Dec 20
JNCGU Oct, Nov, Dec 2020 Oct 20 – Dec 20
Details of Ash Generation, Utilization November – 2020
Details of Ash Generation, Utilization October – 2020
21st EC Compliance Report Apr-Sep 2020
20th EC Compliance Report May 2020
Environmental Monitoring Reports of JNSTPP Jul-Sep 2020
Environmental Monitoring Reports of JNCGU (Jaypee Cement Grinding Unit) Jul-Sep 2020
Half Yearly Battery Returns of JNSTPP Apr-Sep 2020
Half Yearly Battery Returns of JNCGU Apr-Sep 2020
Ash Availability Details of JNSTPP August – 2020
Ash Availability Details of JNSTPP July – 2020
Details of Ash Generation, Utilization June – 2020
Details of Ash Generation, Utilization May – 2020
Ash Availability Details of JNSTPP April – 2020
Ash Availability Details of JNSTPP March – 2020
Details of Ash Generation, Utilization February – 2020
Details of Ash Generation, Utilization January – 2020
Ash Availability Details of JNSTPP December- 2019
Details of Ash Generation, Utilization November – 2019
19th EC Compliance Report November – 2019
Ash Availability Details of JNSTPP September – 2019
Details of Ash Generation, Utilization August – 2019
Ash Availability Details of JNSTPP July  – 2019
Details of Ash Generation, Utilization June – 2019
JNCGU Environment Statement Report 2018 – 2019
JNSTPP Environment Statement Report 2018 – 2019
18th EC Compliance Report May 2019
Details of Ash Generation, Utilization May 2019
Details of Ash Generation, Utilization Apr 2019
Ash Availability Details of JNSTPP Mar 2019
Ash Availability Details of JNSTPP 2018 – 2019
Ash Availability Details of JNSTPP Jan 2019
Ash Availability Details of JNSTPP Dec 2018
Ash Availability Details of JNSTPP Nov 2018
17th EC Compliance Report Nov 2018
Details of Ash Generation, Utilization Oct 2018
Details of Ash Generation, Utilization Sep 2018
ES Nigrie Power Plant 2017 – 2018
ES Nigrie Grinding Unit 2017 – 2018
Details of Ash Generation, Utilization Aug 2018
Details of Ash Generation, Utilization July 2018
Details of Ash Generation, Utilization June 2018
Details of Ash Generation, Utilization May 2018
16th EC Compliance Report Oct 2017 to Mar 2018
Details of Ash Generation, Utilization April 2018
Details of Ash Generation, Utilization Mar 2018
Details of Ash Generation, Utilization Feb 2018
Details of Ash Generation, Utilization Jan 2018
15th EC Compliance Report April 2017 to Sept 2017
JPNSTPP’s Environmental Statement (FY 2016 -2017)
JNCGU’s Environmental Statement (FY 2016 -2017)
EC Compliance Report April 2017 to June 2017
EC Compliance Report March 2017 to May 2017
EC Compliance Report October 2016 to March 2017
EC Compliance Report Dec 2016 to Feb 2017
 EC Compliance Report April 2016 to September 2016
 JPNSTPP’s Environmental Statement (FY 2015-2016)
  JNCGU Environmental Statement (FY 2015-2016)
EC Compliance Report (Modified) October 2015 to March 2016
EC Compliance Report October 2015 to March 2016
EIA Report
EC Amendment December 2014
Environmental Clearance December 2014
Environmental Compliance Report April 2015- September 2015
Environment Statement April 2014- March 2015
Environment Statement Report (Jaypee Cement Grinding Unit) April 2014- March 2015
Bills of landed price of coal for JNSTPP
Month Week
Aug 2024 Biomass
Coal Invoice
Railway Charges
Other Charges
Jul 2024 Biomass
Coal Invoice
Railway Charges
Other Charges
Jun 2024 Biomass
Coal Invoice
Railway Charges
Other Charges

Bara Thermal Power Plant — 3×660 MW

Project Profile 1980 MW super critical technology boiler based project in Bara, Allahabad, Uttar Pradesh Features:
            • Project was awarded on Case-II bidding
            • Lol issued in March 2009, SPA executed in July 2009s
            • Mega Power Status awarded to 3×660 MW Phase-I
            • Works on all packages progressing in full swing
Expected Commissioning:
            • UNIT I (660 MW) COMMISSIONED AND COMMERCIAL OPERATIONS STARTED W.E.F. 28.02.2016
            • UNIT II – July 2016
            • UNIT III – September 2016
Title Date
Environment compliance reports October 2018 to March 2019
Environment compliance report April 2018 to September 2018
Environment compliance report October 2016 to March 2017
Environment compliance report (Cement Grinding Unit) October 2016 to March 2017

Bina Thermal Power plant – 500 MW

Project Profile JPVL has acquired Bina Power Supply Company Limited (BPSCL) from Aditya Birla Group. BPSCL was set up by the Aditya Birla Group to set up a coal fired Thermal Power Plant at Bina in the state of Madhya Pradesh. The project was commissioned in April 2013. Regulatory Information
Title Month
Bina Coal Details Jul 2024
Bina Coal Details Jun 2024
Bina Coal Details May 2024
Environment
Title Date
Environment Compliance Report Oct 2022 To Mar 2023
Environment Statement JBTPP 2021-2022
Environment Compliance Report Apr 2022 To Sep 2022
Environment Compliance Report Oct 2021 To Mar 2022
Environment Compliance Report Apr 2021 To Sep 2021
Environment Compliance Report Oct 2017 To Mar 2018
Environment Compliance Report Mar 2017 To May 2017
Environment Compliance Report Dec 2016 To Feb 2017
Environment Compliance Report Oct 2014 To Mar 2015
Environment Compliance Status Apr 2014 To Sept 2014
Environment Clearance Compliance Report Oct 2013 To Mar 2014
Bills of landed price of coal for JBTPP
Month Week
Jun 2024 Week 1
Week 2
Week 3
Week 4
May 2024 Week 1
Week 2
Week 3
Week 4
Apr 2024 Week 1
Week 2
Week 3
Week 4

Nigrie Thermal Power Plant – 2X660 MW

Project Profile Jaypee Nigrie Super Thermal Power Project comprising 2 x 660 MW Super-critical Unit has been set up by JPVL at a site in Nigrie – Village, Tehsil – Deosar, District – Singrauli in Madhya Pradesh. The project was commissioned in February 2015. The Nigrie Thermal Project is utilizing coal from Amelia (North) Coal Block with the reserve of 123 MT. Features:
  • Super critical boiler technology will achieve an unprecedented net efficiency level for brown coal power stations. This technology’s higher steam temperatures and pressure parameters offer the most economical way to improve plant efficiency and operating flexibility – as well as achieve fuel cost savings and lower emissions for each KWH of electricity
  • Improved thermal efficiency
  • Lower emissions levels
  • Lower operating costs
  • Greater operating flexibility
  • Reduced fuel consumption
  • Reduced fuel cost
  • Reduced ash generation
  • Reduction of carbon dioxide emission due to less consumption of fuel
  • Very good part load efficiency as compared to sub-critical unit
  • Reduced NOx, Sox and SPM emission
Technical Information
      • 1320 MW super critical technology boiler, pit head based Thermal Power Plant
      • 400 KV DC Power Transmission Line will be commissioned by June 2013
      • Railway Sidings viz. Nigrie-Niwas Road Railway station and Amelia (North) – Majhauli Railway Station will be commissioned by July 2013
Regulatory Information
Title Month
Nigrie Billing Coal Details Jun 2024
Nigrie Billing Coal Details May 2024
Nigrie Billing Coal Details Apr 2024
Environment
Title Date
Ash Availability Details of JNSTPP Jul – 2024
Quaterly Monitoring Report JNSTPP Apr 2024 – Jun 2024
Quaterly Monitoring Report JNCGU Apr 2024 – Jun 2024
Ash Availability Details of JNSTPP Jun – 2024
Ash Availability Details of JNSTPP May – 2024
Ash Availability Details of JNSTPP Apr – 2024
Half yearly EC Compliance JNSTPP, Nigrie Oct 2023 – Mar 2024
Quaterly Monitoring Report JNSTPP Jan 2024 – Mar 2024
Quaterly Monitoring Report JNCGU Jan 2024 – Mar 2024
Ash Availability Details of JNSTPP Mar – 2024
Ash Availability Details of JNSTPP Feb – 2024
Ash Availability Details of JNSTPP Jan – 2024
Quaterly Monitoring Report JNSTPP Oct 2023 – Dec 2023
Quaterly Monitoring Report JNCGU Oct 2023 – Dec 2023
Half yearly EC Compliance JNSTPP, Nigrie Apr 2023 – Sep 2023
Quaterly monitoring report JNSTPP Jul 2023 – Sep 2023
Quaterly monitoring report JNCGU Jul 2023 – Sep 2023
Quaterly monitoring report JNSTPP Apr 2023 – Jun 2023
Quaterly monitoring report JNCGU Apr 2023 – Jun 2023
Half yearly EC Compliance JNSTPP, Nigrie Oct 2022 – Mar 2023
Quaterly monitoring report JNSTPP Jan 2023 – Mar 2023
Quaterly monitoring report JNCGU Jan 2023 – Mar 2023
Quaterly monitoring report JNSTPP Oct 2022 – Dec 2022
Quaterly monitoring report JNCGU Oct 2022 – Dec 2022
Half yearly EC Compliance JNSTPP, Nigrie Apr 2022 – Sep 2022
Ash Availability Details of JNSTPP Nov- 2023
Ash Availability Details of JNSTPP Oct- 2023
Ash Availability Details of JNSTPP Sep- 2023
Ash Availability Details of JNSTPP Aug- 2023
Ash Availability Details of JNSTPP Jul- 2023
Ash Availability Details of JNSTPP Jun- 2023
Ash Availability Details of JNSTPP May- 2023
Ash Availability Details of JNSTPP Apr- 2023
Ash Availability Details of JNSTPP Mar – 2023
Ash Availability Details of JNSTPP Feb – 2023
Ash Availability Details of JNSTPP Jan – 2023
Ash Availability Details of JNSTPP Dec – 2022
Ash Availability Details of JNSTPP Nov – 2022
Ash Availability Details of JNSTPP Oct – 2022
Ash Availability Details of JNSTPP Sep – 2022
Quaterly monitoring report JNSTPP Jul 2022 – Sep 2022
Quaterly monitoring report JNCGU Jul 2022 – Sep 2022
Ash Availability Details of JNSTPP Aug- 2022
Ash Availability Details of JNSTPP July- 2022
Quarterly Report-JNSTPP Apr 2022 – Jun 2022
Quarterly Report-JNCGU Apr 2022 – Jun 2022
Ash Availability Details of JNSTPP Jun- 2022
Ash Availability Details of JNSTPP May- 2022
Half yearly EC Compliance JNSTPP, Nigrie Oct 2021 – Mar 2022
JNSTPP, Nigrie Environment Statement 2022-23
JNCGU, Nigrie Environment Statement 2022-23
JNSTPP, Nigrie Environment Statement 2021-22
JNCGU, Nigrie Environment Statement 2021-22
Ash Availability Details of JNSTPP April- 2022
Quarterly Report-JNSTPP Jan 2022 – March 2022
Quarterly Report-JNCGU Jan 2022 – March 2022
Ash Availability Details of JNSTPP March – 2022
Details of Ash Generation, Utilization up to the Month of February – 2022 February – 2022
Details of Ash Generation, Utilization up to the Month of January – 2022 January – 2022
Quaterly monitoring report JNSTPP Oct 2021 – Dec 2021
Quaterly monitoring report JNCGU Oct, 2021 – Dec, 2021
Details of Ash Generation, Utilization up to the Month of December – 2021 December – 2021
Details of Ash Generation, Utilization up to the Month of November – 2021 November – 2021
Details of Ash Generation, Utilization up to the Month of October – 2021 October – 2021
Half yearly EC Compliance JNSTPP April 2021 – Sept 2021
Quaterly monitoring report JNCGU July, 2021 – Sept, 2021
Quaterly monitoring report JNSTPP July, 2021 – Sept, 2021
Details of Ash Generation, Utilization up to the Month of Sep- 2021 Sept 2021
Details of Ash Generation, Utilization up to the Month of Aug – 2021 Aug 2021
Details of Ash Generation, Utilization up to the Month of July – 2021 Jul 2021
Quaterly report (JNSTPP, Nigrie) April-June,2021
Quaterly Report ((JNCGU, Nigrie) April-June,2021
Details of Ash Generation, Utilization up to the Month of June – 2021 June – 2021
Environment Statement Report of JNCGU (Jaypee Cement Grinding Unit) 2020 – 2021
Environment Statement Report (JNSTPP) 2020 – 2021
22nd EC Compliance Report Oct 2020 – Mar 2021
22nd EC Compliance Report Oct 2020 – Mar 2021
Details of Ash Generation, Utilization up to the Month of May – 2021 May – 2021
Details of Ash Generation, Utilization up to the Month of March – 2021 March – 2021
JNSTPP Jan, Feb, March 2021 Jan’21 – Mar’21
JNCGU Jan, Feb, March 2021 Jan’21 – Mar’21
Details of Ash Generation, Utilization up to the Month of February – 2021 February – 2021
Details of Ash Generation, Utilization up to the Month of January – 2021 January – 2021
Ash Availability Details of JNSTPP December – 2020
JNSTPP Oct, Nov, Dec 2020 Oct 20 – Dec 20
JNCGU Oct, Nov, Dec 2020 Oct 20 – Dec 20
Details of Ash Generation, Utilization November – 2020
Details of Ash Generation, Utilization October – 2020
21st EC Compliance Report Apr-Sep 2020
20th EC Compliance Report May 2020
Environmental Monitoring Reports of JNSTPP Jul-Sep 2020
Environmental Monitoring Reports of JNCGU (Jaypee Cement Grinding Unit) Jul-Sep 2020
Half Yearly Battery Returns of JNSTPP Apr-Sep 2020
Half Yearly Battery Returns of JNCGU Apr-Sep 2020
Ash Availability Details of JNSTPP August – 2020
Ash Availability Details of JNSTPP July – 2020
Details of Ash Generation, Utilization June – 2020
Details of Ash Generation, Utilization May – 2020
Ash Availability Details of JNSTPP April – 2020
Ash Availability Details of JNSTPP March – 2020
Details of Ash Generation, Utilization February – 2020
Details of Ash Generation, Utilization January – 2020
Ash Availability Details of JNSTPP December- 2019
Details of Ash Generation, Utilization November – 2019
19th EC Compliance Report November – 2019
Ash Availability Details of JNSTPP September – 2019
Details of Ash Generation, Utilization August – 2019
Ash Availability Details of JNSTPP July  – 2019
Details of Ash Generation, Utilization June – 2019
JNCGU Environment Statement Report 2018 – 2019
JNSTPP Environment Statement Report 2018 – 2019
18th EC Compliance Report May 2019
Details of Ash Generation, Utilization May 2019
Details of Ash Generation, Utilization Apr 2019
Ash Availability Details of JNSTPP Mar 2019
Ash Availability Details of JNSTPP 2018 – 2019
Ash Availability Details of JNSTPP Jan 2019
Ash Availability Details of JNSTPP Dec 2018
Ash Availability Details of JNSTPP Nov 2018
17th EC Compliance Report Nov 2018
Details of Ash Generation, Utilization Oct 2018
Details of Ash Generation, Utilization Sep 2018
ES Nigrie Power Plant 2017 – 2018
ES Nigrie Grinding Unit 2017 – 2018
Details of Ash Generation, Utilization Aug 2018
Details of Ash Generation, Utilization July 2018
Details of Ash Generation, Utilization June 2018
Details of Ash Generation, Utilization May 2018
16th EC Compliance Report Oct 2017 to Mar 2018
Details of Ash Generation, Utilization April 2018
Details of Ash Generation, Utilization Mar 2018
Details of Ash Generation, Utilization Feb 2018
Details of Ash Generation, Utilization Jan 2018
15th EC Compliance Report April 2017 to Sept 2017
JPNSTPP’s Environmental Statement (FY 2016 -2017)
JNCGU’s Environmental Statement (FY 2016 -2017)
EC Compliance Report April 2017 to June 2017
EC Compliance Report March 2017 to May 2017
EC Compliance Report October 2016 to March 2017
EC Compliance Report Dec 2016 to Feb 2017
 EC Compliance Report April 2016 to September 2016
 JPNSTPP’s Environmental Statement (FY 2015-2016)
  JNCGU Environmental Statement (FY 2015-2016)
EC Compliance Report (Modified) October 2015 to March 2016
EC Compliance Report October 2015 to March 2016
EIA Report
EC Amendment December 2014
Environmental Clearance December 2014
Environmental Compliance Report April 2015- September 2015
Environment Statement April 2014- March 2015
Environment Statement Report (Jaypee Cement Grinding Unit) April 2014- March 2015
Bills of landed price of coal for JNSTPP
Month Week
Jun 2024 Biomass
Coal Invoice
Railway Charges
Other Charges
May 2024 Biomass
Coal Invoice
Railway Charges
Other Charges
Apr 2024 Biomass
Coal Invoice
Railway Charges
Other Charges

Bara Thermal Power Plant — 3×660 MW

Project Profile 1980 MW super critical technology boiler based project in Bara, Allahabad, Uttar Pradesh Features:
            • Project was awarded on Case-II bidding
            • Lol issued in March 2009, SPA executed in July 2009s
            • Mega Power Status awarded to 3×660 MW Phase-I
            • Works on all packages progressing in full swing
Expected Commissioning:
            • UNIT I (660 MW) COMMISSIONED AND COMMERCIAL OPERATIONS STARTED W.E.F. 28.02.2016
            • UNIT II – July 2016
            • UNIT III – September 2016
Title Date
Environment compliance reports October 2018 to March 2019
Environment compliance report April 2018 to September 2018
Environment compliance report October 2016 to March 2017
Environment compliance report (Cement Grinding Unit) October 2016 to March 2017