Bina Thermal Power plant – 500 MW

Project Profile JPVL has acquired Bina Power Supply Company Limited (BPSCL) from Aditya Birla Group. BPSCL was set up by the Aditya Birla Group to set up a coal fired Thermal Power Plant at Bina in the state of Madhya Pradesh.The project was commissioned in April 2013.

Regulatory Information Environment

Title Date
Environment Compliance Report April 2017 To June 2017
Environment Compliance Report Mar 2017 To May 2017
Environment Compliance Report Dec 2016 To Feb 2017
Environment Compliance Report October, 2014 – March, 2015
Environment Compliance Status April 2014 to Sept. 2014
Environment Clearance Compliance Report October 2013 to March 2014

Nigrie Thermal Power Plant – 2X660 MW

Project Profile Jaypee Nigrie Super Thermal Power Project comprising 2 x 660 MW Super-critical Unit has been set up by JPVL at a site in Nigrie – Village, Tehsil – Deosar, District – Singrauli in Madhya Pradesh. The project was commissioned in February 2015. The Nigrie Thermal Project is utilizing coal from coal from Amelia (North) Coal Block with reserve of 123 MT. Features:

  • Super critical boiler technology will achieve an unprecedented net efficiency level for brown coal power stations. This technology’s higher steam temperatures and pressure parameters offer the most economical way to improve plant efficiency and operating flexibility – as well as achieve fuel cost savings and lower emissions for each KWH of electricity
  • Improved thermal efficiency
  • Lower emissions levels
  • Lower operating costs
  • Greater operating flexibility
  • Reduced fuel consumption
  • Reduced fuel cost
  • Reduced ash generation
  • Reduction of carbon dioxide emission due to less consumption of fuel
  • Very good part load efficiency as compared to sub-critical unit
  • Reduced NOx,Sox and SPM emission

Technical Information

      • 1320 MW super critical technology boiler, pit head based Thermal Power Plant
      • 400 KV DC Power Transmission Line will be commissioned by June 2013
      • Railway Sidings viz. Nigrie-Niwas Road Railway station and Amelia (North) – Majhauli Railway Station will be commissioned by July 2013

Regulatory Information Environment

Title Date
15th EC Compliance Report April 2017 to Sept 2017
JPNSTPP’s Environmental Statement (FY 2016 -2017)
JNCGU’s Environmental Statement (FY 2016 -2017)
EC Compliance Report April 2017 To June 2017
EC Compliance Report March 2017 to May 2017
EC Compliance Report October 2016 to March 2017
EC Compliance Report Dec 2016 To Feb 2017
 EC Compliance Report April 2016 to September 2016
 JPNSTPP’s Environmental Statement (FY 2015-2016)
  JNCGU Environmental Statement (FY 2015-2016)
EC Compliance Report (Modified) October 2015 to March 2016
EC Compliance Report October 2015 to March 2016
EIA Report
EC Amendment December 2014
Environmental Clearance December 2014
Environmental Compliance Report April 2015- September 2015
Environment Statement April 2014- March 2015
Environment Statement Report (Jaypee Cement Grinding Unit) April 2014- March 2015

Bara Thermal Power Plant — 3×660 MW

Project Profile 1980 MW super critical technology boiler based project in Bara, Allahabad, Uttar Pradesh Features:

            • Project was awarded on Case-II bidding
            • Lol issued in March 2009, SPA executed in July 2009s
            • Mega Power Status awarded to 3×660 MW Phase-I
            • Works on all packages progressing in full swing

Expected Commissioning:

            • UNIT I (660 MW) COMMISSIONED AND COMMERCIAL OPERATIONS STARTED W.E.F. 28.02.2016
            • UNIT II – July 2016
            • UNIT III – September 2016
Title Date

Environment compliance report
October 2016 to March 2017
Environment compliance report (Cement Grinding Unit) October 2016 to March 2017

Copyright ©2008. Jaiprakash Power Ventures Limited.