logo
  • Sector-128 Noida-201304 Uttar Pradesh India

  • (120) 4609000, 2470800

  • All Group Sites-:

300 MW Baspa-II Hydropower Project, Himachal Pradesh

Mandatory Discharge for Environment 0.1416 cumec

300MW BASPA-II HYDROPOWER PROJECT,HIMACHAL PRADESH

DISCHARGE DOWNSTREAM OF BASPA BARRAGE
Date Time DISCHARGE (in Cumec)
Date:      Click here for Water Discharge Report
Date Time Discharge

Copyright ©2008. Jaiprakash Power Ventures Limited.